Work item
Miramar
-
🔬 Lab Jira Task
No card is written for this work item. It earns one with the Urgent / Pending Vendor / Need Follow-up / False Alarm label, or after one press of Refresh.这个工单不会自动写分析:打上 “Urgent / Pending Vendor / Need Follow-up / False Alarm” 标签,或者按一次“重新生成”。
Basic Information
MDA failure records: 1 unit at AFT · Jira failure rate 0.27% (1/377).
SN GVW62R01645500E2 — NTF / Under FA(UFA)
Analysis: atc_tests.yml configuration corrupted on Diags after reboot at AFT station, preventing dtest service from executing diagnostic commands. Failure rate 1.32% (1/76). Device power-off during troubleshooting caused dtest service reboot, masking failure and preventing log collection for deeper analysis. Evidence from 20261116170234.jpg shows command/response exchange confirming TestResult FAIL status.
PQA Mark
your own words — no sync and no AI writes hereReport Fields
History
every change, namedOther Information
[Miramar_hq_vn][DVT_MAIN][MDF1][FATP][NTF] read_diag_version@AFT
Schedule
Nothing on the calendar for this yet.
Subtasks
No subtasks.
Deliverables / Attachments
No deliverables recorded yet. Paste a picture into a block, or type the final file or folder in Details → Deliverables.
Paste into any box, or drop a file here / click to choose
Linked Page
Take this work item back to the moment it was imported?
What Jira and MDA brought in stays. A published report is not touched. This cannot be undone.
Create
Drop a PPT, PDF or image here, or click to choose
The notes are saved as the first progress entry, with the files beside
them. The nine report fields and ✨ AI Generate belong to a work item reported through Jira, and are on its page.
Every
A meeting, reminder or repeating task pops up a loud reminder on any open desk page at the
time you choose, with a Join button when there is a link. The desk has to be open in a tab to ring.
Paste a picture into a text box, or drop files here / click to choose. They stay on this machine.