Work item

Miramar

- 🔬 Lab Jira Task

AI AnalysisAI 分析

not written yet
who gets a card哪些工单有

Basic Information

T-43
DVT
Factory
BFT_MLB
New
2026-11-20 19:39
2026-11-20 19:39
MDA failure records: 1 unit at BFT_MLB · Jira failure rate 0.04% (1/2535).
SN PVW51C0164640071 — NTF / Under FA(UFA)
Analysis: flux residue on BFT2 fixture probes created poor electrical contact. Failure rate 0.05% (1/2222). Unit successfully retested at BFT1, confirming device integrity. Probe contamination identified and cleaned, restoring contact and enabling test passage. Corrective Action Implement mandatory fixture probe inspection and cleaning procedure before DVT line start-up. CM DRI: Adam. Preventive maintenance

PQA Mark

your own words — no sync and no AI writes here
PQA Label

Report Fields

The nine report boxes and ✨ AI Generate are for a work item reported through Jira. This one was made on the desk, so it carries the work, the comments and its page instead.

History

every change, named

Other Information

[Miramar_hq_vn][DVT_MAIN][MDM1][SMT][NTF] flash_fip_bl2.bin@BFT_MLB

Schedule

Nothing on the calendar for this yet.

Subtasks (0)

No subtasks.

Deliverables / Attachments

No deliverables recorded yet. Paste a picture into a block, or type the final file or folder in Details → Deliverables.
Paste into any box, or drop a file here / click to choose

Linked Page

🔔 Reminder ·